Carouge (GE): parcel changes
Municipality in the canton of Geneva · FSO no. 6608
Counted by the month a change first appeared in the monthly swisstopo data: Sept 2025 to Aug 2026. Data collected 30 Sept 2026.
Open the map at the Carouge (GE) center
Between Sept 2025 and Aug 2026, snoop detected 2 parcel changes in Carouge (GE): 1 splits, 0 merges, 0 new parcels and 1 changed parcels. 100% of the changes are in building zones.
Key figures
- Parcel changes
- 2
- 3.6% of the canton
- Parcel splits
- 1
5% of the canton
- Parcel merges
- 0
0% of the canton
- New parcels
- 0
- Changed parcels
- 1
0 resized, 1 re-identified
5.6% of the canton
About Carouge (GE)
Carouge (GE) is number 6 of 10 municipalities in the canton of Geneva by parcel changes in this period. Carouge (GE) accounts for 3.6% of the parcel changes in the canton of Geneva.
The busiest month was Aug 2026, with 2 changes.
Timeline
Change types
| Type | Changes | Share |
|---|---|---|
| SplitsOne parcel became several. | 1 | 50.0% |
| MergesSeveral parcels became one. | 0 | 0.0% |
| New parcelsA parcel that did not exist before. | 0 | 0.0% |
| Removed parcelsA parcel that no longer exists. | 0 | 0.0% |
| Re-identifiedSame footprint, new EGRID. | 1 | 50.0% |
| ResizedSame EGRID, changed boundary or area. | 0 | 0.0% |
2 of the 2 changes (100%) are in building zones.
Splits and merges are derived from parcel geometry; the other types come from changes in the set of EGRIDs.
Recent changes
The 2 newest parcel changes
- Re-IDpublished 1 Aug 2026
1’938 m² → 1’894 m² · Zone de développement 5
- Splitpublished 1 Aug 2026
1’040 m² → 1’084 m² · 1 to 2 parcels · Zone de développement 5
More municipalities in the canton of Geneva
- Bernex4 changes
- Cartigny1 changes
- Chêne-Bougeries3 changes
- Dardagny1 changes
- Le Grand-Saconnex3 changes
- Meyrin3 changes
- Plan-les-Ouates5 changes
- Vernier1 changes
- Versoix2 changes
About the data
snoop compares successive snapshots of the official cadastral survey from swisstopo and derives each split, merge and new parcel from that comparison. A change is counted in the month it first appeared in the published data, so a month keeps its figure once it is out. Only municipalities with at least one change in the period have a page. For legally binding information, check the land register.