Between Sept 2025 and Aug 2026, snoop detected 6 parcel changes in Fully (VS): 0 splits, 0 merges, 1 new parcels and 4 changed parcels. 1 parcels were removed. 100% of the changes are in building zones.
Key figures
- Parcel changes
- 6
- 1% of the canton
- Parcel splits
- 0
- Parcel merges
- 0
0% of the canton
- New parcels
- 1
0.4% of the canton
- Changed parcels
- 4
4 resized, 0 re-identified
1.8% of the canton
About Fully
Fully is number 6 of 40 municipalities in the canton of Valais by parcel changes in this period. Fully accounts for 1% of the parcel changes in the canton of Valais.
The busiest month was Aug 2026, with 6 changes.
Timeline
Change types
| Type | Changes | Share |
|---|---|---|
| SplitsOne parcel became several. | 0 | 0.0% |
| MergesSeveral parcels became one. | 0 | 0.0% |
| New parcelsA parcel that did not exist before. | 1 | 16.7% |
| Removed parcelsA parcel that no longer exists. | 1 | 16.7% |
| Re-identifiedSame footprint, new EGRID. | 0 | 0.0% |
| ResizedSame EGRID, changed boundary or area. | 4 | 66.7% |
6 of the 6 changes (100%) are in building zones.
Splits and merges are derived from parcel geometry; the other types come from changes in the set of EGRIDs.
Recent changes
The 6 newest parcel changes
- Resized22 May 2025
1’242 m² → 1’542 m² · Zone moyenne densité
- Resized11 Mar 2026
4’633 m² → 5’133 m² · Zone collectifs
- Resized27 May 2026
4’782 m² → 3’784 m² · Zone coteau
- Resized11 Mar 2026
2’103 m² → 1’602 m² · Zone collectifs
- Removedpublished 1 Aug 2026
300 m² · Zone moyenne densité
- New27 May 2026
998 m² · Zone coteau
More municipalities in the canton of Valais
About the data
snoop compares successive snapshots of the official cadastral survey from swisstopo and derives each split, merge and new parcel from that comparison. A change is counted in the month it first appeared in the published data, so a month keeps its figure once it is out. Only municipalities with at least one change in the period have a page. For legally binding information, check the land register.